Laserfiche WebLink
C <br />C <br />SWRCB, January 2002 <br />Page -of- <br />of9. SPILL/OVERFILL CONTAINMENT BOXES <br />9. <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: <br />0 Pressure ❑ Vacuum VMydrostatic <br />0 Other (Specify) <br />Test Equipment Used: :X:Mc 00 T S — 5-'S Equipment Resolution: OZ, <br />Spill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />► 7" <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />`31D M' 'A S <br />Test Start Time: <br />z; 2•,y6 <br />Initial Reading (Ru): <br />3.00SV 3.08s1" <br />Test End Time: <br />2.1,49' 3'•01 <br />Final Reading (RF): <br />3.0$52" 3.0$55" <br />Test Duration: <br />2 X <br />Change in Reading (RF-Ri): <br />_ <br />O5" .0()04" <br />Pass/Fail Threshold or <br />Criteria: <br />. OC)Z <br />Test Result: Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />