Laserfiche WebLink
U <br />C.' Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturerspec ist)gecessary to verify that this <br />information is correct and a Plot Plan showingthe layout of monitoring equipment. For an , e ue ry <br />y gQ Qt-'Eapable of generating such <br />reports, I have also attaclipd a copy of the repo ; (check alt that apply): stem s �'m history report <br />Technician Name (print): =,�%s�� r r,e -: q Signature: <br />Certification No.: �� <br />License. No.: <br />Testing Company Nam'e Phone o <br />Date o <br />f Testing/Servicing: ,n� / Servic-, in�g. ' DSite Address w / <br />_ <br />/� U <br />Monitoring System Certification Page I of 3 <br />D. Results of Testing/Servicing <br />Software Version Installed: <br />Camnlete the fnlanwina ehaMlr®ict• <br />03/01 <br />es <br />❑ No* <br />I Is the audible alarm o rational? <br />V—Yes <br />❑ No* <br />I Is the visual alarm o rational? <br />R—Yes <br />❑ No* <br />Were all sensors visually inspEYA functionally tesLed, and confirmed operational? <br />Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br />will not interfere with theiEpLo22r operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />IR�V/A <br />operational? <br />OL,Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ump/Trench Sensors; ispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks Wd sensor failure/disconnection? es; ❑ No. <br />es <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />❑ N/A <br />mechanical overfill prevention valve. is installed), is the overfill warning alarm visible and audible at the tank <br />fill in s and operating ro rl If so at what rcent of tank does the alarm tri er? <br />es* <br />❑ No <br />Was any monitoring equipment replaced? , If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all lacement in Section E below. <br />❑ Yes* <br />o <br />Was liquid found inside any secondary; containment systems designed as dry systems? (Check all that apply) <br />❑ Produ ❑ Water. If es describe causes in Section below. <br />V -Yes <br />❑ No* <br />Was monito ' set reviewed to ensure m settings? Attach set its if applicable <br />❑ No* <br />Is all monitorin equipmento rational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E Comments: <br />D....,. '1 ^r 1 <br />