Laserfiche WebLink
n <br />SWRCB, January 2002 <br />C7 <br />Page of <br />8. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overf ill Containment Boxes Q <br />Spill/Overfill Containment Boxes are Present, but were Not Tested Q <br />Test Method Developed By: Q Spill Bucket Manufacturer Q Industry Standard Q Professional Engineer <br />Q Other (Specify) <br />Test Method Used: Q Pressure Q Vacuum X Hydrostatic <br />Q Other (Specify) <br />Test Equipment Used: UST 2001 probes or Air Bellows gauging system Equipment Resolution: 0.001 " / 0.005" <br />ENEENESESIM <br />mom Spill Box # Spill Boz # Spill Box # Spill Box # <br />Bucket Diameter: 12" <br />Bucket Depth. 12" +/- <br />Wait time between applying <br />pressure/vacuum/water and 10 min <br />starting test: <br />Test Start Time: 0 <br />Initial Reading (RI): 5.101 <br />Test End Time: 30 <br />Final Reading (RF): 5.101 <br />Test Duration: 30 mins <br />Change in Reading (RF -RI): 0.000 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: Pass ® Pass 0 Fail 0 Pass 0 Fail ® Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended ollow-up or ailed tests) <br />Replaced drain <br />