Laserfiche WebLink
SWRCB, January 2002 • <br />6_ PIPING 91 TMP TESTING <br />• Page of <br />Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: UST 2001 probes or Air Bellows gauging system Equipment Resolution: 0.001 " / 0.005" <br />Sump # 1 <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />� <br />product and water)? <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown? <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Was fail-safe verified to be <br />operational? <br />0 yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R0'. <br />Pass/Fail Threshold or Criteria: <br />Visual fail <br />Test Result: <br />0 Pass Q Fail <br />0 Pass Q Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />0 yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />0 Yes 0 No 0 NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Need boots not tested visual fail <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />