Laserfiche WebLink
SWRCB, January 2002 0 0 Page of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industryy Standard Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: UST 2001 probes or Air Bellows gauging system Equipment Resolution: 0.001 " / 0.005" <br />Spill Boz # Spill Box # Spill Boa # Spill Boa # <br />I R,,..t—f Tl;—f— II 11" 1 1 1 II <br />Bucket Depth: <br />12" +/- <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min <br />Test Start Time: <br />Initial Reading (RI): <br />6.74 <br />Test End Time: <br />Final Reading (RF): <br />5.40 <br />Test Duration: <br />30 mins <br />Change in Reading (RF -R,): <br />- 1.34" <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />0 Pass x Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Bad drain (?) <br />