My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2300 - Underground Storage Tank Program
>
PR0231732
>
COMPLIANCE INFO_1999-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:09:15 PM
Creation date
6/3/2020 9:51:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2010
RECORD_ID
PR0231732
PE
2361
FACILITY_ID
FA0003648
FACILITY_NAME
STKN ARMY AVIATION SUPP FACILITY*
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17726004
CURRENT_STATUS
01
SITE_LOCATION
2000 STIMSON RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231732_2000 STIMSON_1999-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 0 0 Page of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industryy Standard Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: UST 2001 probes or Air Bellows gauging system Equipment Resolution: 0.001 " / 0.005" <br />Spill Boz # Spill Box # Spill Boa # Spill Boa # <br />I R,,..tâf Tl;âfâ II 11" 1 1 1 II <br />Bucket Depth: <br />12" +/- <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min <br />Test Start Time: <br />Initial Reading (RI): <br />6.74 <br />Test End Time: <br />Final Reading (RF): <br />5.40 <br />Test Duration: <br />30 mins <br />Change in Reading (RF -R,): <br />- 1.34" <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />0 Pass x Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />Comments â (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Bad drain (?) <br />
The URL can be used to link to this page
Your browser does not support the video tag.