Laserfiche WebLink
NIFIED PROGRAM CONSOLIDATED FOPM <br /> UNDERGROUND STORAGE TANK <br /> t MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(s)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ I olo 10 1 - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) � ���� 5 t' 3. <br /> BUSINESS SITE ADDRESS 2004 (3 -MS0,C 103. CITY C i`+1„n 104. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,-2634,-263-82-2641) _ <br /> 490-3a <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. C3 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> ----------------------------------------- ---- ---- - _-- - r - ----- -- ---------------- <br /> a �.�+ 490-7. (* T 490-8 <br /> -------------PANEL MANUFACTURER E%W ,0 _ (, _---V IP e _ _ :_MODEL#: <br /> .i�Y_•__------------ <br /> LEAK SENSOR MANUFACTURER: 490-9. i MODEL#(S): U STL 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> ------------__ --__- - --------------------------------------- __- _ -- -- -- -- - ---------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ---------------------------------------------------------___-_ -- -_ _ __-_-- - -- - - - -- ------------ <br /> -- - - -------- <br /> LEAK TEST FREQUENCY: Ela.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ® d.MONTHLY ----- -^ -Q e.OTHER(Specify): 490-17 <br /> --- ---- - -- ------- - - ----- - - --------------------- <br /> 490-18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b..0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: [Ia.36 HOURS [:1b.60 HOURS 490-21 <br /> 490-22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:&.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> _-____PANEL MANUFACTURER: G % W - a90 30 I MODEL#: p - 490-31 <br /> 490-32 490-33 MODEL#(S)_ `Sr <br /> LEAK SENSOR MANUFACTURER:- G�- - _----__-____-____-_________- t�ST.- __--_____- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. R]a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. K a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED S23 CCR 2636)_ _ -_- 490-36 <br /> MLLD MANUFACTURER(S): 190-37 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ---- - - -- - - - --- -- ___-- ------- - --- - - --- -------- <br /> ELLD MANUFACTURER(S) 49°4°. i MODEL#(S): ago-41 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DiSCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a..YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-4649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitoring of unburied emergency enerator fuel piping only per HSC 25281.5(6)(3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />