Laserfiche WebLink
UNDERGROUND STORAGE TANK UNAUTHORIZED RELEASE (LEAK)/CONTAMINATION SITE REPORT <br /> EMERGENCY HAS STATE OFFICE OF EMERGENCY SERVICES FOR IOGAC AGENCY USE ONLY. <br /> YES NO REPORT BEEN FILED 9 <br /> YES Q NO 1HEREBYCEfTtiFY TIHAVED!$TRIBUTEPTHI$jNFQRMATICN:ACCORDING TOTHE. <br /> IISTRMtI SFf THE�V NC SHEET ON THE BACK PAGE OF;THIS FORM <br /> REPORT DATE FCASI a <br /> M M TE <br /> NAME OF INDIVIDUAL FILING REPORT PHONE SIGNATURE <br /> t c f } <br /> w REPRESENTING a OWNERIOPE REGIONAL BOARD COMPANY OR AGENCY NAME` <br /> cc LOCALAGENCY a OTHER ; <br /> ADDRESS - <br /> STREET CITY STATE ZIP <br /> w <br /> NAME CONTACT PERSON TPHCNE <br /> zdl, Q UNKNOWN } <br /> O� <br /> a a ADDRESS a <br /> w <br /> w <br /> 11AE CRY STATE iP <br /> FACILITY NAME(IF APPLICABLE) OPERATOR I PHONE <br /> O <br /> ADDRESS <br /> 303A E0 <br /> w - STREET CRY COUNTY ZIP <br /> CROSS STREET <br /> O LOCAL AGENCY AGENCY NAME CONTACT PERSON PHONE <br /> z 6 <br /> w U / 1 <br /> w w REGIONAL BOARD PHONE <br /> 0- <br /> C/) <br /> N (t} NAME QUANTITY LOST(GALLONS) <br /> LU <br /> ,. UW <br /> J UNKNOWN <br /> m z( 2) <br /> UNKNOWN <br /> z DATE DISCOVERED HOW DISCOVERED ® INVENTORY CONTROL 0 SUBSURFACE MONITORING ❑ NUISANCE CONDITIONS <br /> w MI MI D DI v v ❑ TANK TEST � TANK REMOVAL OTHERnmh#i 51w4age, c uft <br /> e <br /> a DATE DISCHARGE BEGAN METHOD USED TO STOP DISCHARGE(CHECK ALL THAT APPCYf <br /> co <br /> UNKNOWN E]REMOVE CONTENTS F-]CLOSETANK&REMOVE REPAIR PIPING <br /> Lu M d D Y Y <br /> HAS DISCHARGE BEEN STOPPED 9 F-1 REPAIR TANK ®CLOSE TANK&FILL IN PLACE E:]CHANGE PROCEDURE <br /> QYES [:] NO IF YES.DATE M D &q v Y O REPLACE TANK OTHER <br /> 0 <br /> 0 SOURCE OF DISCHARGE CAUSE(S) <br /> aa F TANK LEAK ❑ UNKNOWN ® OVERFILL E] RUPTURE/FAILURE SPILL <br /> 00 <br /> PIPING LEAK ❑`'OTHER ® CORROSION F--j UNKNOWN 0 OTHER <br /> w w CHECK ONE ONLY> <br /> U�: t9luNDETERMINED ❑ SOIL ONLY 0 GROUNDWATER : DRINKING WATER -(CHECK ONLY IF WATER WELLS HAVE ACTUALLY BEEN AFFECTED) <br /> ECKONE ONLY <br /> z� ® NO ACTION TAKEN PRELIMINARY SITE ASSESSMENT WORKPLAN SUBMITTED ® POLLUTION CHARACTERIZATION <br /> w <br /> cr <br /> N LEAK BEING CONFIRMED ❑ PRELIMINARYSITE ASSESSMENT UNDERWAY ❑ POST CLEANUP MONITORING IN PROGRESS <br /> REMEDIATION PLAN F-� CASE CLOSED(CLEANUP COMPLETED OR UNNECESSARY) a CLEANUP UNDERWAY <br /> CHECK APPROPRIATE ACTION(S) a EXCAVATE&DISPOSE(ED)- ❑ REMOVE FREE PRODUCT(FP) 0 ENHANCED BIO DEGRADATION(11) <br /> 'SEE SACK n oErAcsl <br /> aF3 0 z CAP SITE(CD) ❑ EXCAVATE&TREAT(ET) ❑ PUMP&TREAT GROUNDWATER(GT)❑ REPLACE SUPPLY(RS) <br /> w a� CONTAINMENT BARRIER(CB) �: NOACTION REQUIRED(NA) ❑ TREATMENT AT HOOKUP(HU) ❑ VENT SOIL(VS) <br /> a: F--j VACUUM EXTRACT(VE) OTHER(OT) <br /> cj df <br /> z <br /> w <br /> eyt Y, dl <br /> 8 <br /> HSC 05(&'90). <br />