My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />TOTAL <br />CONTAINMENT <br />ENVIROFLEX® INSTALLATION CHECKLIST No. <br />Prior to installation, read the instructions thoroughly. As the Enviroflex installation progresses, initial the items <br />below upon completion. <br />Distributor: <br />Contractor: <br />Address: <br />Date of Installation: <br />Location: <br />Address: <br />1. PRE -INSTALLATION INSPECTION: <br />All pipe and pipe components inspected for damage incurred in shipping and <br />handling. <br />2. TRENCHES: <br />A.Bedded minimum 6" pea gravel, sand or other prior TCI approved material. <br />B. All trenches slope back to sump 1/8" per foot. <br />3. TANK SUMP INSTALLATION INSPECTION [INSTALLED IN ACCORDANCE WITH INSTRUCTIONS]: <br />Type of Tank Sump used: <br />TCI Tank Sump installation instructions followed. <br />4. DISPENSER SUMP INSTALLATION INSPECTION: <br />Type of Dispenser Sump used: <br />TCI Dispenser Sump installation instructions followed. <br />5. SECONDARY PIPE INSTALLATION INSPECTION: <br />A.Interface compression seals and stiffeners were installed and all 300 series <br />stainless steel clamps were torqued to according to installation instructions. <br />B. Secondary pipe tested with 3-5 psi air pressure and soap tested for <br />minimum 15 minutes or in accordance with local codes. <br />C. Secondary piping spaced minumum 4" apart from one another prior to <br />backfilling. <br />6. PRIMARY PIPE INSTALLATION INSPECTION: <br />A. TCI Enviroflex coupling assembly procedures were adhered to during <br />attachment of coupling to primary pipe. <br />B. TCI Coupling Machine was used and inspected for proper expansion <br />diameter prior to use. <br />C. MolyKote Gn metal assembly paste was applied or redistributed on TCI <br />Coupling Machine mandrel before each coupling procedure. <br />D.Enviroflex primary pipe was installed and air pressure tested to 60 psi, or <br />dealer specs, with the following components soaped and inspected for <br />leaks: single adaptors, "Y" fittings, tees, 90's, couplings, and all other <br />threaded joints (includes testing equipment). <br />7. BACKFILLING: <br />A.Tank Sump and Dispenser Sump bases were all adequately backfilled and <br />voids tamped and checked for maximum base support. <br />B. All pipe spacing and slope was maintained during backfilling. Direct dumping was avoided. <br />C. Pressure on the primary and secondary pipe was maintained through <br />backfilling and paving process. <br />8. SIGNATURES: <br />Installation Contractor <br />Certified Enviroflex Installer <br />Inspector/Regulatory Official <br />Site Owner's Representative <br />NAME [PLEASE PRINT] <br />SIGNATURE <br />DATE <br />Warranty becomes effec to upon completion and return of checklist and Site Layout to Total Containment, Inc. <br />Return to TCI with Site Layout Sheet <br />REV0795 <br />
The URL can be used to link to this page
Your browser does not support the video tag.