My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />WRITTEN MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />tA <br />Facility Name <br />s C <br />Facility Address 2, 31- <br />A. <br />A. Describe the frequency of performing the monitoring: <br />Tank ® ►n c <br />Piping <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitgnng: <br />Tank <br />Piping <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />�0 (A I', P-, <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />6 LA " <br />E. Reporting format for monito ' S, <br />Tank T 1 U170 <br />1 <br />Piping <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />r '7� <br />but not less than every 12 months: . ' <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.