My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_1996-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:32:29 PM
Creation date
6/3/2020 9:52:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2006
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_1996-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK # <br /># # <br /># <br /># <br />UST SYSTEM DRAWING <br />INFORMATION <br />10,000 8, 000 <br />4,000 <br />MANUFACTURER <br />1. <br />Mo ern <br />Three complete sets of pians (include manufacturer's specification sheets for proposed equipment to be installed). <br />COMPOSITION <br />Steel Steel <br />Steel <br />2. <br />Plans drawn to scale in non -erasable print. <br />13 13 <br />13 <br />/ <br />PRODUCT <br />3. <br />✓ <br />Plot plan to show location of tanks and all associated piping. <br />CORROSION PROTECTION <br />Fiber la s Fiber <br />ass Fiber <br />lass <br />4. <br />U.L. LISTED <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />Yes <br />COMPATIBILITY WITH 100% <br />METHANOL <br />Yes Y3s <br />5. <br />Tank cross-sectional diagram. <br />6. <br />Detail of tank, associated piping, excavation and cover. <br />Tank(s) and i in approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />8. <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. <br />Z <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />1. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />12_ <br />TANK COMPOSITION <br />TANK # <br /># # <br /># <br /># <br /># <br />CAPACITY <br />10,000 8, 000 <br />4,000 <br />MANUFACTURER <br />Modern Modern <br />Mo ern <br />COMPOSITION <br />Steel Steel <br />Steel <br />MODEL <br />13 13 <br />13 <br />PRODUCT <br />Regular Premium <br />Diesel <br />CORROSION PROTECTION <br />Fiber la s Fiber <br />ass Fiber <br />lass <br />U.L. LISTED <br />Yes Yes <br />Yes <br />COMPATIBILITY WITH 100% <br />METHANOL <br />Yes Y3s <br />Yes <br />13. TANK(s) TO BE INSTALLED <br />X A. Ste®l-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaltic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non-ctad steel tank [Section 2635 (a) (2) (A)] <br />____ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection system designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.