Laserfiche WebLink
)7/01/2010 THU 16:52 FAX 203433 <br />1'1 <br />SJC EHD <br />*** FAX TX REPORT *** <br />********************* <br />TRANSMISSION OK <br />JOB NO. 3501 <br />DESTINATION ADDRESS 98458953 <br />PSWD/SUBADDRESS <br />DESTINATION ID <br />ST. TIME 07/01 16:50 <br />USAGE T 01'46 <br />PGS. 5 <br />RESULT OK <br />San Joaquin <br />Environmental Health Department <br />•11 East Main Street <br />Stockton, California95202-3029 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Robert W. Barnhart <br />Reliable Petroleum Services, Inc. <br />521 Branding Iron St. <br />Oakdale, CA 95361 <br />Re: Waterloo Food & Fuel <br />3032 E. Waterloo Road, Stockton, CA 95205 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, RENS <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace the 87 grade mechanical line leak detector (LD) with a <br />new VMI LD model 99LD2000, repair the 87 grade fill spill containment by replacing the Fill <br />Swivel Adaptor 61 SALP, repair the diesel fill spill containment by replacing the Drop Tube 0 - <br />Ring and the Drain Valve O -Ring, and replace the 91 grade fill spill containment with a new <br />OPW 2100C Spill Containment on the underground storage tank (UST) system at the above <br />noted address. The above 87 grade LD has been replaced on June 30, 2010 and passed the <br />3g.p.h. leak test on the same date. <br />The permit has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Jeff Wong at (209) 468-0335 to arrange the following inspection appointments <br />(a 48-hour notice is required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br />test (or equivalent). Proper drainage must also be verified. <br />b. Secondary containment testing on 91 grade tank and fuel line. <br />P <br />1#101" <br />