My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:40:58 PM
Creation date
6/3/2020 9:52:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 "d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ® David A. Winkler El Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />N Credentials': ® ICC Service Tech. ® SWRCB Tank Tester 11 <br />A CPTT.T. RTTCKF.T TF.RTTNG INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: H2O TAPE <br />MEASURE <br />1 87 2 91 <br />® Direct Bury ®Direct Bury <br />❑Contained in Sump ❑ Contained in Sump <br />Equipment Resolution: <br />3 DSL <br />®Direct Bury <br />Contained in <br />SumpSum <br />4 <br />F-1 Direct Bury <br />❑ Contained in <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />Bucket Installation Type:F1 <br />Bucket Diameter: <br />11 11 <br />11 <br />Bucket Depth: <br />15.25 14 <br />13.50 <br />Wait time between applying <br />vacuum/water and start of test: <br />- _ <br />- <br />Test Start Time (Tj): <br />100 100 <br />100 <br />Initial Reading (Rj): <br />14 13 <br />12 <br />Test End Time (TF): <br />200 200 <br />200 <br />Final Reading (RF): <br />14 13 <br />12 <br />Test Duration (TF — TI): <br />IHR IHR <br />IHR <br />Change in Reading (RF - R,): <br />0 0 <br />0 <br />Pass/ Fail Threshold or <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail <br />Z. Pass " ❑Fail <br />Pass El`Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature <br />W Date 6-23-09 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local <br />requirements may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.