My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:40:58 PM
Creation date
6/3/2020 9:52:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.S WRCB, January 2002 Page '� of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill. Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />est Method Developed By: ❑ Spill Bucket Manufaet-&, er ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Methiod UL ,qd: <br />❑ Pressure ❑ Vacuum ❑ Hy is <br />❑ Other (Spec) <br />Test Equipment Used: <br />}i 41 <br />Bucket Diameter: <br />E pnient Resolution: <br />Sp,IhBgx # Spill Bo Spill Box # Spill Box # <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Readin F): <br />Test Dur ion: <br />Ch Ke in Reading (RF-Ri): <br />,11'ass/Fail Threshold or <br />Criteria: <br />1'y <br />Test Result: <br />❑ Pass ❑ Fair ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Com ents — include information on repairs made prior to testing, and recommended ollow-u or ailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.