Laserfiche WebLink
San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />September 17, 2007 <br />Stockton, California 95202-3029 <br />Waterloo Food & Fuel Inc. <br />3032 E. Waterloo Rd. <br />Stockton, CA 95205 <br />Attn: Gurpal Sidhu <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: Amended Approval Letter <br />Waterloo Fod & Fuel, 3032 E. Waterloo Rd., Stockton, <br />DIRECTOR <br />Donna Heran, REHS <br />ASSISTANT DIRECTOR <br />Laurie Cotulla, REHS <br />PROGRAM COORDINATORS <br />Carl Borgman, REHS <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />CA 95205 <br />The San Joaquin County Environmental Health Department (EHD) has completed the <br />review of the application for permit to repair UDC 5 & 6, and install the diesel leak <br />detector and spill bucket at the above noted address. The permit has been approved with <br />the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution <br />Control District for any applicable permits and requirements. <br />2. Contact Toua Yang at (209) 468-3459 to arrange the following inspections <br />appointments (a 48-hour notice is required for inspection appointment(s): <br />a. Spill Bucket: Verify minimum 5 -gallon capacity and pass a 60 -minute <br />Lake Test or equivalent. Proper drainage or removal must also be <br />verified. <br />b. Concrete will be broken; corrosion protection of the remote fill riser must <br />be verified prior to backfilling around the spill bucket. <br />c. Leak Detector Test: Leak detector must be tested to confirm that the <br />device can detect a leak of 3 gallons per hour at 10 psi. <br />d. 24 hour or equivalent lake test on secondary containment to verify <br />tightness. <br />3. Any changes in information and scope of work must be submitted to EHD for <br />approval prior to commencing work. All new addenda supersede the previous <br />ones. <br />4. All components installed must be certified by an independent testing organization <br />and bear the appropriate mark as required by the independent testing organization. <br />5. Concrete will be broken above the tank pit, a tank integrity test must be <br />performed by a third party certified tank tester or Veeder Root TLS console if <br />capable of performing a 0.1 gph tank integrity test. Results shall be received by <br />this office within 7 days of completion of work. <br />