My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3032
>
2300 - Underground Storage Tank Program
>
PR0231758
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:40:58 PM
Creation date
6/3/2020 9:52:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231758
PE
2361
FACILITY_ID
FA0002127
FACILITY_NAME
WESTERN FOOD & FUEL
STREET_NUMBER
3032
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3032 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231758_3032 E WATERLOO_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-, <br />,A DEGRO MRAGE TANK <br />MONITORING PL - PAGE 1 <br />TYPE OF ACTION] 1. NEW PLAN ❑ 2. CHANGE OF 04FORMATION <br />M01 <br />PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br />M02. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMS) <br />I. FACffiffY IWORMATION <br />FACILITY ID # (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY NAME) LVy $ V F(� <br />M03, <br />BUSINESS SITE ADDRESS -2 . LAJ 2/I j Mao <br />CITY C -4 <br />Mos. <br />H. EQLqPMENT ITSMG AND PREVENTWE MMNTENANCIE <br />State law requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed at <br />the frequency specified by the equipment manufacturers' instructions, or annually, whichever is more firequent, and that such work must be performed by <br />qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED 191. ANNUALLY MOs. ❑ 99. OTHER (Specify): <br />Mm <br />DL MONITORMG LOCATIONS* <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locationswhere itoring is performed (i.e., location of each tensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monituring Site Pian from a Monitoring System Certification <br />form H Materials Bust Plan etc. which shows all required inf inc! it with this an <br />IV. TANK MONffOPING <br />MONITORING IS PERFORMED USING THE FOLLOWING HOD(S): (Check all that y) <br />M10. <br />I . CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR MAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT IS:^ V a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />M11 <br />PANEL MANUFACTURER: � w M12. MODEL #: �- i P®f <br />Mr3. <br />LEAK SENSOR MANUFACTURER: P-4 liq C. Mt4. MODEL #(S): N 1 (1 ":7 <br />M15. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: M16. MODEL 9: <br />M17. <br />IN -TANK PROBE MANUFACTURER: MIS. MODEL #(S): <br />M19. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M20. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): M21. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify). M22. <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />"tit. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M25. <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 ej <br />TEST FREQUENCY: ❑ b. BIENNIALLY ❑ c. OTHER (Specify): M26. <br />M27. <br />❑ 6.VISUAL MONITORING: r7a. DAILY ❑ b. WEEKLY <br />❑ 99. OTHER (Specify): <br />M29. <br />V. PIPE MONMIMG <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />M30. <br />10 1. CONTINUOUS MONITORING OF PIPING SUMPS H(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. VACUUM <br />M31. <br />PANEL MANUFACTURER: Y� (,g�`i� '.M32- MODEL #: <br />M33. <br />LEAK SENSOR MANUFACTURER: V5 M34. MODEL #(S): 'TS 4A Ll <br />WILL A PIPING LEAK ALARM TRIGGER AI1T6MAi7iC PUMP (i.e., TURBINE) SHUTDOWN? ❑ a. YES ❑ b. NO <br />M36 - <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMPS WN? ❑ a. YES ❑ b_ NO <br />M37. <br />fR 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORM5�3.0 g.ph LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETF-CTE Ok `��! <br />MLLD MANUFACTURER(s): t ` Mas. <br />MODEL #(S): � U <br />M39. <br />3. ELECTRONIC LINE LEAK DETIECTOR (AL.LD) THAT ROUTINELY PERFORMS 3.0 g p.h. LEAK TESTS \ <br />ELLD MANUFACTURER(s) ` M40. MODEL #(S): <br />M41. <br />PROGRAMMED IN LINE TESTINt ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.K <br />M42. <br />WILL ELLD DETECTION OF A PIPING.LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M43. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />M44. <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. O (Spcify) M45. <br />.05 <br />M46. <br />. <br />05. VISUAL MONITORING: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY dr EACH TIME SYSTEM OPERATED* <br />M47. <br />• Aftwed ra mm iitaing of unbuded ffid Mpg �y t" HSC §252SI.5rox3) <br />❑ 6. SUCTION PIPING MEETS E PTION C APER 23 CCR §2636(a�3} <br />❑ ?. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />Mos. <br />hwfwrc-d (9/24/04) -1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.