My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
5611
>
2300 - Underground Storage Tank Program
>
PR0231764
>
COMPLIANCE INFO_2002-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 3:20:02 PM
Creation date
6/3/2020 9:52:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2010
RECORD_ID
PR0231764
PE
2361
FACILITY_ID
FA0002160
FACILITY_NAME
BlackHawk Petroleum Inc.
STREET_NUMBER
5611
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710052
CURRENT_STATUS
01
SITE_LOCATION
5611 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231764_5611 E WATERLOO_2002-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [] NO� <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for <br /> each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br /> and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br /> drawn to scale showing location of repairs and/or replacements. If repairing a component, describe how this will <br /> be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST <br /> Installation Application pages 4-8 as necessary for a timely plan review): <br /> jj,h,,� GlJ V V V <br /> l <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.