My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:22:53 PM
Creation date
6/3/2020 9:52:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank Monitorinon - Page 2 of 2 0 <br />VI. DISPENSER MONITORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) M50 <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: M51. MODEL #: M52 <br />LEAK SENSOR MANUFACTURER: M53. MODEL #(S): M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a. YES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO MIT <br />® 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: Bravo M58. MODEL #(S): M59 <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) M60 <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) M61 <br />V11. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) M80. <br />1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of January 1, 2005) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): M81 <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005, this facility will have a "Designated UST Operator" who has passed the California UST Sytem Operator Exam administered by the International <br />Code Council (ICC). By July 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance <br />of the UST systems. This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency): M85. <br />Note regarding Section X. Pending certification of a Designated UST Operator, the following person has authority for performing the monitoring <br />activities and maintaining leak detection equipment covered by this plan. NAME: JOB TITLE: <br />The overfill prevention is a flapper valve set to shut off at 95% <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br />APPLICATION — FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br />LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br />OF THE FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />O OPERATOR SIGNATURE REPRESENTING <br />DATE: M91. <br />❑ Owner M90. <br />® Operator <br />January 12, 2009 <br />EP/C PERATOR NAME (print): M92. <br />OWNER/OPERATOR TITLE: M93, <br />Amanda Appelt <br />Environmental Manager <br />(Agency Use Only) This pl has been reviewed and: Approved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: t • Date: <br />Comments/Special Conditio : <br />UN -022A - 4/6 www.unidocs.org Rev. 10/14/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.