My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2011-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:27:40 PM
Creation date
6/3/2020 9:52:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2016
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2011-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Method By: <br />Test Method Uses: <br />Descriptio <br />SECONDARY LINE TESTING <br />O Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />• Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />n Line #1 Line #2 Line #3 <br />Tank product <br />Pipe manufacturer <br />Pipe material <br />Primary pipe diameter (inches) <br />Gasoline - 87 <br />Smith <br />FRP <br />2 <br />Red Diesel <br />Smith <br />FRP <br />2 <br />Diesel <br />Smith <br />FRP <br />2 <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />3 <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />70 <br />70 <br />85 <br />(include length of branch runs) <br />1:00 <br />1:00 <br />1:00 <br />Wait time for pressure to stabilize (hr:min) <br />0:15 <br />0:15 <br />0:15 <br />Test start time <br />9:00 AM <br />9:10 AM <br />9:07 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />10:00 AM <br />10:10 AM <br />10:07 AM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />0.0 <br />0.0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />Comments: <br />0 2014 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.