My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2011-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:27:40 PM
Creation date
6/3/2020 9:52:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2016
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2011-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 18, 2014 <br />JoaquinSan • <br />Environmentalr. <br />1868 East Hazelton <br />Stockton,California95205-6232 <br />Veronica Freitas <br />Walton Engineering, Inc. <br />P.O. Box 1025 <br />West Sacramento, CA 95691 <br />1 468-3420 <br />I' 464-0138 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />Re: Flyers Energy, LLC SR0068473 <br />3300 Waterloo, Stockton <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the addendum to the referenced permit application previously approved on November 14, 2013, <br />to upgrade the ECPU2 Board and perform a cold start on the monitoring system of the <br />underground storage tank (UST) system at the above noted address. The permit has been <br />approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Jeffrey Wong at (209) 468-0335 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. Obtain a copy of the <br />alarm history prior to performing the "cold start' of the Veeder Root system and <br />made available at the time of EHD inspection. <br />Please be aware that the facility cannot operate the UST system tank prior to the <br />EHD inspection and approval. <br />4. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.