Laserfiche WebLink
March 18, 2014 <br />JoaquinSan • <br />Environmentalr. <br />1868 East Hazelton <br />Stockton,California95205-6232 <br />Veronica Freitas <br />Walton Engineering, Inc. <br />P.O. Box 1025 <br />West Sacramento, CA 95691 <br />1 468-3420 <br />I' 464-0138 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />Rodney Estrada, REHS <br />Adrienne Ellsaesser, REHS <br />Re: Flyers Energy, LLC SR0068473 <br />3300 Waterloo, Stockton <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the addendum to the referenced permit application previously approved on November 14, 2013, <br />to upgrade the ECPU2 Board and perform a cold start on the monitoring system of the <br />underground storage tank (UST) system at the above noted address. The permit has been <br />approved with the following conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Jeffrey Wong at (209) 468-0335 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. Obtain a copy of the <br />alarm history prior to performing the "cold start' of the Veeder Root system and <br />made available at the time of EHD inspection. <br />Please be aware that the facility cannot operate the UST system tank prior to the <br />EHD inspection and approval. <br />4. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), or a <br />Tank Tester's license issued to the individual by the State Water Board, and <br />