My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231765
>
COMPLIANCE INFO_2011-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 4:27:40 PM
Creation date
6/3/2020 9:52:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2016
RECORD_ID
PR0231765
PE
2361
FACILITY_ID
FA0003600
FACILITY_NAME
Nella Oil #427
STREET_NUMBER
3300
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3300 Waterloo Rd
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231765_3300 WATERLOO_2011-2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />UNDERGROUND STORAGE TANK SYSTEM <br />® DESIGNATED OPERATOR FACILITY EMPLOYEE TRAINING RECORD <br />For use by Unidocs Member agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 23, Div. 3, Ch. l6 California Code of Regulations (CCR) <br />Facility Name: FLYER'S #427 <br />Facility Site Address: 3300 WATERLOO RD City: STOCKTON <br />L` <br />Section 2715 of Title 23, California Code of Regulations, requires that Designated Underground Storage Tank Operators <br />provide training to facility employees who have responsibilities associated with the operation and/or maintenance of <br />underground storage tank (UST) systems. This training must be provided by July 1, 2005, and every 12 months thereafter. For <br />facility employees hired after July 1, 2005, the initial training must be provided within 30 days of the date of Hire. At least one <br />of the facility employees present during operating hours must have current training. This training must include, but is not <br />limited to, the following items as specified in 23 CCR Sections 2715(f)(1) and (2): <br />❑ Operation of the UST system in a manner consistent with the facility's Best Management Practices; <br />❑ The employee's role with regard to UST monitoring equipment as specified in the written UST Monitoring Plan; <br />❑ The employee's role with regard to spills and overfills as specified in the written UST Response Plan; <br />❑ Name(s) of contact person(s) for emergencies and monitoring equipment alarms; <br />❑ For facilities that are not routinely staffed, facility employee responsibilities as specified in the training program <br />approved by (lie local UST regulatory agency. <br />23 CCR § 2715(f)(3) requires that a list of employees who have been trained by the Designated Underground Storage Tank <br />Operators) be maintained on-site, or off-site at a readily -available location if approved by the local agent, and provided to <br />the local agency upon request. Completion of this form will satisfy UST training record keeping requirements. The following <br />employees have been trained as required by 23 CCR Sections 2715(f)(1) and (2): <br />Facility Em l vee Na1ne <br />Training Date <br />Hine Date' <br />Trainer Name <br />12/12/11 <br />JAKE LYON <br />I <br />(Conflnued o!r rei,erse) <br />1 If hired alter July 1, 2005. <br />a Trainer must be a current Designated UST Operator for the facility at the time of training. <br />Uv -061 -1/2 <br />wwwalnidocs.org <br />07/13/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.