Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.slclov.org/ehd/unitiii.html <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br />Facility Flyer#427 Cardlock <br />VIOLATIONS <br />Facility <br />3300 Waterloo, Stockon <br />Date: Inspection Dec 1, 2011 <br />Name: <br />Address: <br />HSC = California Health and Safety Code; CCR = California Code of Regulations <br />Facility Amanda A elt <br />C1 <br />C2 <br />Tale: Environmental Manager <br />Mf-"885-0401Contact: <br />p p <br />File Review <br />101 HSC 25284 <br />No permit to operate <br />Inspection XRoutine XMonitoring System Certification C Installation Ll Complaint - ID#: ❑ ter: <br />Type: <br />No written agreement between the person that the operating permit was issued to and the tank operator to <br />(Authority HSC 25289) <br />b sch notifl Environmental Manage <br />A ppelt (by '/ Title: <br />Consentfor: Xlnspection []Sampling XPhotos <br />Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />Granted by:Amanda <br />Monitoring <br />GilbarCo EMC <br />Piping <br />XPressurized 11 Suction ❑ Gravity <br />Overfill <br />Prevention: XMechanical [IAudible/visual <br />Panel: <br />System: <br />Secondary containment: (a) test not performed; (e) test report not submitted within 30 days; (f) test notification <br />108 CCR 2637 <br />UST <br />5 <br />6 <br />7 <br />(e) test notification not provided to the EHD at least 48 hours prior to conducting an installation, repair, <br />replacement, calibration, or certification <br />110 HSC 25291(f) <br />Annual line leak detector test not performed (M1) <br />111 HSC 25284.2 <br />Annual spill containment testing not performed <br />Product <br />87 -octane <br />RED DSL <br />DSL <br />114 CCR 2715(b) <br />Designated operator does not possess a current ICC CA UST System Operator certification <br />Repair for tank or piping not tested for tightness after completion of the repair pursuant to (1102) <br />115 CCR 2660(k) <br />permit conditions <br />Designatedb Lyon <br />Jacob (8052304) <br />ICC Exp. 611 /2012 <br />Violations: XM1-Release Detection 11M2 -Release Prevention ❑ M3 -Both <br />Operator: <br />Date: <br />118 HSC 25286(a) <br />Operational permit not amended when UST storage and/or monitoring system changed <br />On Site Service <br />Walkins <br />ICC Exp. Manufacturer's (512/13) B35391 <br />5/5/2012 VR VMI #2577 (1/10/12) <br />Technician: Jessie <br />Date: <br />Training: <br />Jeffrey Wong (209) 468-0335 <br />EHD 23-02 Rev 09/01/11 11 Page 1 UST INSPECTION REPORT <br />VIOLATIONS <br />HSC = California Health and Safety Code; CCR = California Code of Regulations <br /># <br />C1 <br />C2 <br />I M <br />I Code Section <br />C1 = Class 1 violation C2 = Class 2 violation M - Minor violation <br />File Review <br />101 HSC 25284 <br />No permit to operate <br />102 HSC 25404.5 <br />Annual operating fees not paid <br />No written agreement between the person that the operating permit was issued to and the tank operator to <br />103 HSC 25284(a)(3) <br />monitor the tanks stem <br />104 HSC 25292.2 <br />Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 CCR 2711 <br />Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />106 CCR 2632(b) <br />Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 CCR 2632(d)(1)(C) <br />Plot plan/site map not submitted or fails to completely show where monitoring is performed <br />Secondary containment: (a) test not performed; (e) test report not submitted within 30 days; (f) test notification <br />108 CCR 2637 <br />not provided to the EHD at least 48 hours prior to conducting the test <br />Monitoring equipment certification: (a) not performed annually; (d) test report not submitted within 30 days; <br />109 CCR 2638 <br />(e) test notification not provided to the EHD at least 48 hours prior to conducting an installation, repair, <br />replacement, calibration, or certification <br />110 HSC 25291(f) <br />Annual line leak detector test not performed (M1) <br />111 HSC 25284.2 <br />Annual spill containment testing not performed <br />112 CCR 2636(f)(4) <br />Annual line tightness test not performed if positive shutdown or fail safe not present (M1) <br />113 CCR 2715(a) <br />Failed to inform the EHD of a change of designated operator within 30 days <br />114 CCR 2715(b) <br />Designated operator does not possess a current ICC CA UST System Operator certification <br />Repair for tank or piping not tested for tightness after completion of the repair pursuant to (1102) <br />115 CCR 2660(k) <br />permit conditions <br />Enhanced leak detection (ELD) testing not performed on a system located within 1000' of public well, or <br />116 HSC 25292.5 <br />failures not repaired and retested <br />117 CCR 2661 <br />Permit to repair UST system not obtained <br />118 HSC 25286(a) <br />Operational permit not amended when UST storage and/or monitoring system changed <br />119 HSC 25298(b) <br />Permit to temporarily close UST system not obtained <br />120 HSC 25298(c) <br />Permit to close UST system not obtained <br />On Site Record <br />intenance monitoring records not maintained 3 years, cathodic protection records for 6'% years, written <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />201 X CCR 2712(b) <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, round water elevations, or other test results; 6 results of inventory readings and reconciliations <br />202 CCR 2712(i) <br />Monitoring plan, response plan, and/or operating permit and all conditions not onsite <br />Unauthorized release that: (c) did not escape secondary containment and cleaned up within eight hours (M1) <br />203 CCR 2650 <br />was not recorded; (e) escaped secondary containment, not cleaned up after eight hours, or a sudden loss of <br />product was not reported to the EHD within 24 hours <br />Jeffrey Wong (209) 468-0335 <br />EHD 23-02 Rev 09/01/11 11 Page 1 UST INSPECTION REPORT <br />