My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 4:44:22 PM
Creation date
6/3/2020 9:53:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCM,January 2002 0 0 Page 7. <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ❑X Industry Standard F-1 Professional Engineer <br /> ❑ Other (Specify) <br /> Test Method Used: FI Pressure F] Vacuum ❑x Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: incon Equipment Resolution: +-.002 0 <br /> UDC# 9-10 UDC# 9-10 UDC# 11-12 UDC# 11-12 <br /> UDC Manufacturer: f iberg f iberg f iberg f iberg <br /> UDC Material: f iberg f iberg f iberg f iberg <br /> UDC Depth: 24" 24" 24" 24" <br /> Height from UDC Top to Top of 10" l0" 1 o" 1011 <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 411 411 411 411 <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: clean clean clean clean <br /> Portion of UDC Tested: 1 2"above 2"above 2"above 2"above <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes❑N�N ❑Yes❑N�N aYes�N�N [-]Yes[]No�T <br /> product and water)?* <br /> Turbine shutdown response time: <br /> Is system programmed for fail-safe D 0 []Yes <br /> ❑ ❑ ❑ F-57 ❑ ❑ <br /> shutdown?* Yes N X N Yes N X N Yes N N Yes No X <br /> Was fail-safe verified to be ❑ ❑ ❑ D ❑ ❑ ❑ ❑ <br /> operational?* Yes N X N Yes N X N Yes N X N Yes No X <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15min 15min 15min 15min <br /> test: <br /> Test Start Time: 1223 1239 1223 1239 <br /> Initial Reading(Ri): 4.6821 4.6805 4.3061 4.3058 <br /> Test End Time: 1238 1254 1238 1254 <br /> Final Reading(RF): 4.6817 4.6800 4.3054 4.3061 <br /> Test Duration: 15min 15min 15min 15min <br /> Change in Reading(RF-Ri ): - .0004 -.0005 - .0007 +.0003 <br /> Pass/Fail Threshold or Criteria: .0020 .0020 .0020 .0020 <br /> mom= mom= <br /> Was sensor removed for testing? ff1Yes❑NoE]NA R Yes❑No❑NA E]Yes❑No❑NA EYes❑No t <br /> Was sensor properly replaced and ❑ � � ❑ � cO ❑ � � ❑ <br /> verified functional after testing? X Ye N NA X Ye N NA X Ye N NA X Yes N`�__f <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer toanyof the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.