Laserfiche WebLink
San Joaquin County DIRECTOR <br /> Environmental Health Department Donna Heran, REHS <br /> 2> "2 600 East Main Street <br /> ASSISTANT LaurieDIRECTOR <br /> Q. t Laurie Cotulla, REHS <br /> Stockton, California 95202-3029 <br /> PROGRAM COORDINATORS <br /> Margaret Lagorio, REHS <br /> Website:www.sjgov.org/ehd Robert McClellon, REHS <br /> q F O R Phone: (209)468-3420 Jeff Carruesco, REHS,RDI <br /> Fax: (209)464-0138 Kasey Foley, REHS <br /> September 18,2009 <br /> Mary Weithman <br /> Service Station System,Inc. 'i <br /> 680 Quinn Avenue <br /> San Jose,CA 95112 ✓ �M <br /> martyw@servicestationsystems.com <br /> Subject: Chevron#99840,4344 E.Waterloo,Stockton, CA 95215 (SR0058344) L',v 1 <br /> The San Joaquin County Environmental Health Department(EHI))has completed the review of <br /> the 9/16/2009 permit application and 9/18/2009 addendum for Ari emergency cold start of the <br /> Veeder-Root(VR)TLS 350 system which took place on 9/1212009,and replacement of the 91 � <br /> grade UST sump sensor VR-352 with a VR-2/pling <br /> a permit has been approved with the <br /> following conditions: <br /> 1. Contact the local fire department, locbuilding department and the San <br /> Joaquin Valley Air Pollution Controly applicable permits. <br /> 2. Contact Jeffrey Wong(468-0335)tolowing inspection. A 48-hour notice <br /> is required: <br /> a. The EHD must witness)lie functionality of the monitoring system to ensure <br /> that monitoring has been restored to meet the requirements of California <br /> Code of Regulationo4itle 23 and the Health& Safety Code. All monitoring <br /> system sensors mjst be tested. Please be aware that the facility cannot operate <br /> before the EHD)nspection and approval of this Post-Cold Start Functionality <br /> Test. <br /> 3. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD)for approval prior to commencing work.All new addenda supersede <br /> the previous ones. <br /> 4. If concrete is broken near the UST system,a hydrostatic test by a SWRCB licensed tank <br /> tester, or a taAk secondary containment test,must be performed in accordance with the <br /> manufacfnents <br /> guidelines and witnessed by EHD. <br /> 5. All comp must be certified by an independent testing organization and labeled as <br /> requiredorganization. (UL,ULC,ANSI,API, ASTM,etc. See California Code of <br /> Regulations(CCR),Title 23 Chapter 16 Table B for complete list). The component must <br /> bear the appropriate mark as required by the independent testing organization. <br /> 6. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid,current contractor's licenses issued by the <br /> Contractors State License Board(may be issued to the installation company), and <br /> Page 1 of 2 <br />