Laserfiche WebLink
OCT-07-2009 09:32 Service Station Systems 408 938 8888 P.02 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES® NO <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all mamAaCturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a Copy of the"Site Health and Safety <br /> Plan'is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will las done. (If <br /> loft piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pa 4-8 as necessary for a timely plan review); <br /> replaced ECPU2 Board <br /> install VR 208 sensor in 87 STP sump (replacement for 352 sensor) <br /> 4. list of equipment lo be used(Attach manufacturers specification sheets showing third—party approval): <br /> ECPU2 unit-VR-331500-358 (see previously sent sheet) <br /> VR 208 sensor (see previously sent sheet) <br /> 2 <br /> TOTAL P.02 <br />