My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 4:44:22 PM
Creation date
6/3/2020 9:53:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-07-2009 09:32 Service Station Systems 408 938 8888 P.02 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES® NO <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all mamAaCturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a Copy of the"Site Health and Safety <br /> Plan'is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will las done. (If <br /> loft piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pa 4-8 as necessary for a timely plan review); <br /> replaced ECPU2 Board <br /> install VR 208 sensor in 87 STP sump (replacement for 352 sensor) <br /> 4. list of equipment lo be used(Attach manufacturers specification sheets showing third—party approval): <br /> ECPU2 unit-VR-331500-358 (see previously sent sheet) <br /> VR 208 sensor (see previously sent sheet) <br /> 2 <br /> TOTAL P.02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.