My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 4:44:22 PM
Creation date
6/3/2020 9:53:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2011
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2007-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAI <br /> (Submit minimum of 3 sets of plans&applications as originals i be retained by EHD) <br /> .. Site map_enclosed? .~S[_] .°^~E] <br /> — Submit_ copies of ICC Service Technicianand/or"Installer's ce i ate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> -. Detailed description_work ~~~completed, <br /> to scale showing location of repairs andi- --Pi ments. If repairing a component, describe how this will be done. (If <br /> ag"In piping, UDC's, or other LIST equip nt or performing tank top upgrade, use the LIST Installation Application <br /> pages 4-8 as necessary for a timely plan view): <br /> emergency response to co ant warm start; cold started the VR- <br /> also reDlaced bad 352jre*"'n' sor "like for like" C_ j-) <br /> 4. List pfequipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> see attached <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.