Laserfiche WebLink
SWRCB,January 2002 Page 2 <br /> 9. S L/OVERFILL CONTAINMENT&S <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: <br /> Test Method Developed By: F—] Spill Bucket Manufacturer Fx--]Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: F] Pressure Vacuum ❑ Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 87 1 Spill Box# 91 2 Spill Box# Spill Box# <br /> Bucket Diameter: 13 13 <br /> Bucket Depth: 15 15 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 min 1 MIN <br /> starting test: <br /> Test Start Time: 1024 1027 <br /> Initial Reading(Ri ): -30 -30 <br /> Test End Time: 1025 1028 <br /> Final Reading(RF ): -29 -28 <br /> Test Duration: 1 MIN 1 MIN <br /> Change in Reading(R F-RI ) 1 2 <br /> Pass/Fail Threshold or 4 4 <br /> Criteria: <br /> ON 01 <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />