Laserfiche WebLink
FIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of 2) <br /> TYPE OF ACTION ® 1.NEW PLAN [12.CHANGE OF INFORMATION ago-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) � � 1 _ � � � H � � � � 1 <br /> BUSINESS NAME(Same as Facility Name or DBA) 3. <br /> Chevron Station# 99840 <br /> BUSINESS SITE ADDRESS 103. CITY 104, <br /> 4344 Waterloo Rd. Stockton, CA 95215 <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annual] ,whichever is more frequent.Such work must be performed by qualified personnel:[23 ccR§2632,2634,2638,26411 <br /> ...... .......................................................__..._....._............. .._.-_......... _Y............................................................................9......................................_........__._..................... _ .... <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY El99.OTHER S eci 490-3a. <br /> Q ( P �)' 490-3b. <br /> 111. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) " ck <br /> apply) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,2634] <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Veeder-Root 490-1. MODEL#: TLS-350 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 990- MODEL#(S): Liquid Sensor Series 794380-407 490-10. <br /> _._..----- . ..................... --.............. .................._-...-....._.................................. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl. <br /> [2 3 CCR§2643] 490-11. <br /> PANEL MANUFACTURER 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS Lj b.DAILY/NIGHTLY U c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER490-18. <br /> g•P• g.p.h. (Specify): 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646.1] 490-20. <br /> ........................................................................................................_......................................._..._...-...-........... -_ -..............__... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§2645] TESTING PERIOD: E] a.36 HOURS [Ib.60 HOURS 490-22446 <br /> -2l <br /> ............... ....................................................................._.................................-_._._.......-......-.._._.............................._....................................__.................................................I............................. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.1] 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER_. (Specify): 490-24. <br /> Q P fY) 491-z5. <br /> ❑ 99.OTHER(Specify): 490-26. <br /> ago-z7. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Checkall <br /> that apply) <br /> 0 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCRSECONDARY CONTAINMENT IS: ® a.DRY El b.LIQUID FILLED ® c.PRESSURIZED [:1d.UNDER VACUUM 490-29. <br /> §2636] <br /> PANEL MANUFACTURER:Veeder-Root 490-30. MODEL#: TLS-350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 490-32. MODEL#(S): Liquid Sensor Series 794380-352 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> ................................................................................................._.-._..._ .._....__...._..--'--'---....__............._...._.._..._............................................._......_........................._._............................... <br /> .................................................-'---'----'-- .. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR§2636] <br /> MLLD MANUFACTURER(S): 490-37. MODEL#(S): 490-38. <br /> ...... ._._...............................................................................................................................1. ........................................................._.._......................... ............_............. <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§2636] 490-39. <br /> ELLD MANUFACTURER(S):Veeder-Root 490-40. MODEL#(S):PLLD Series 848480-003 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49043. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 49144. <br /> ............................................_...............................__._........................................................................_............................................................ <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4909046. <br /> ....................................._.._...................................._..---................__..__......--._.......__.-...__...............-_......................................................................................................._................................_..__._......._�__.. <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed formonitorin of unburied emergencyenerator.fuelpiping.onlyperHSC§2528.1:5(6)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)] 490-51. <br /> ................................................_..__...........................................__..._....._..........................--'--'--............................._.__......._..................--'--.........................................._....._.............................................-................................__..-._........_.-..__._......................_................................................................................................................... <br /> 490-51......... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. <br /> _......_.__.... ---...-- -..._...._.._..........._._...._............................................................................... -....................._._.. - <br /> ❑ <br /> ago <br /> 99.OTHER(Specify) <br /> 490.53.. <br />