Laserfiche WebLink
Work Order: 2279305 <br /> SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC TE SMC <br /> Test]Method Developed By: _.._ _D UDC Manufacturer ❑Industry Standard D Professional Rnarirteer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum C Hydrostatic <br /> 0 Other(Spec) — <br /> Test Equipment Used:ELLDS Equipment Resolution: .0007 <br /> U IC# `7 T Ul)C l# UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: <br /> UDC Depth: L <br /> Height from UDC Bottom to Top <br /> of Highest Pi inQ Penetration: <br /> Height from UDC Bottom to i <br /> Lowest Electrical Penetration: J <br /> Condition of UDC prior to f <br /> testing: <br /> Portion of UDC Tested 2"above highest 2"above highest— 2"above highest 2"above highest <br /> penetration enetration _ penetration penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both v Yes 0 No ANA 0 Yes D No C NA D Yes ❑No 0 NA -'Yes ❑ATo DNA <br /> product and water)?' _j <br /> Turbine shutdown res onse time NIA N/A N/A N/A <br /> Is system programmed for fail- ❑yes D No bI NA ❑Yes C 1 ATo 0 NA D Xes ❑No C7 NA ❑Yes ❑No DNA <br /> safe shutdown? -- - — -- <br /> Was tail-safe verified to be C yes h No SIA 0 Yes ONo GNA CJ Ycs 0 No ❑NA f I Yes ONo CNA <br /> operational? - <br /> Wait time between applying f. ��— <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test _ ------ <br /> Test Start Time_ — <br /> Initial Reading(Ri): -- <br /> Test End Time: <br /> Final Reading Ete) —� _ '�'. 61! ` 5'• •-— I - <br /> Test Duration: 15 minutes 15 minutes 15 minutes _15 minutes <br /> Change in Reading(Rr-R�): - u_ <br /> Pass/Fail Thresholdor Criteria: 0T0020 0.0020 0.0020 _ 0.0020 <br /> Test Result: k Pass 0 Fail 0 Pass ❑Fail 0 .Pass 0 Fail 0 Pass ❑Fall <br /> Was sensor removed for testing? j ZkYes 0 No DNA ❑yes ❑No DNA 0 Yes 0 No -NA -]Yes !7 No [INA <br /> Was sensor properly replaced and p,Yes 0 No DNA ❑Yes D No DNA ❑Yes D No DNA D Yes ft No ❑NA <br /> verified functional after testing? <br /> Comments-(include information on?' made rior to testing and recommended•follow-up for failed lestl <br /> 'If the entire depth of the LSC is not tested,specify how much was tested. If the answer to ani of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-1 60) <br /> Tanknology Inc. 11000N.MoPac Expressway,Suite 500,Austin,Texas 78759 <br />