Laserfiche WebLink
Feb, 23. 2015 11 : 11AM No. 5147 P. 4 <br /> Page;,of <br /> 6. PIPJNG SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑Pr+ibWV <br /> ❑Other(Specih) <br /> Test Method Used: ❑Pressure El vacuum ®Hydrostat' 2015 <br /> ❑ Other(Specf&) <br /> Test Equipment Used: See attached testing procedures I Equipment ResolutiMVIR <br /> Sump# g 7 Sump# Sump# Sump# <br /> Sump Diameter: y gr <br /> Sump Depth: Z <br /> Sump Material&Manufacturer: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 12- <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 2G Z 9 <br /> Condition of sump prior to testing: 0 K v <br /> Portion of Sum Tested' Above highest Above highest Above highest Above highest <br /> Sump penetration penetration enetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑Yes❑No M NA ❑Yes❑No M NA ❑Yes❑No®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes❑No®NA ®yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes❑No M NA . ❑Yes❑No®NA ❑Yes❑No M NA ❑Yes❑No®NA <br /> operational?* <br /> Wait time between applying <br /> pressme/vacuun/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: f -2 7 <br /> Initial Reading(R°): +y v L- 047 ,39 <br /> Test End Time: 1'2 1 Z 7- 12.122 <br /> Final Reading(RF): 11069 ,3 U 9 y Z <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-R,): 0,0 1--;7 4v Z <br /> Pass/Fail Threshold or Criteria: 0,002 0.002 0.002 0.002 <br /> ')('e8t Result: ® PABS ❑Fail M TPass [jFail ❑ pass ❑fail ❑ pass ..❑Tail'. <br /> Was sensor removed for testing? M Yes❑No❑NA MYes❑No❑NA ®Yes❑No❑NA M Yes❑No❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes ElNo❑NA MYes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Comments— (include information on repairs made prior to resting, and reeontrnended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br /> Received Time Feb, 23. 2015 11 : 21AM No. 8179 <br />