Laserfiche WebLink
0 RECEIVED <br /> F.In-Tank Gauging/SIR Equipment: r Check this box if tank gauging is used only r in t ry c ol. <br /> r Check this box if no tank gauging NVOOi 'n <br /> TAL <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. f4FA! ,r)FPAATiAFNT <br /> Complete the following checklist: <br /> e Yes r No* as all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> +► Yes r No* Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> G Yes r No* Nas accuracy of system product level readings tested? <br /> G Yes r No* Nas accuracy of system water level readings tested? <br /> Yes + No* lWere all probes reinstalled properly? <br /> o Yes °> No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> o Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check a#that <br /> • N/A apply)Simulated leak rate: 3 g.p.h.; r 0.1 g.p.h; 10.2 g.p.h. <br /> *> Yes = No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes r No* Was the testing apparatus properly calibrated? <br /> Yes :+ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> o N/A <br /> * Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> G Yes No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system is disabled or disconnected? <br /> Iry Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system malfunctions or fails a test? <br /> s Yes , No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> z N/A <br /> M Yes No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />