Laserfiche WebLink
44 Y <br /> n. fi L P <br /> SWRCB,January 2002 Page i of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes IN <br /> � .VI RQN,nig ENIL <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: r— Spill Bucket Manufacturer r17 Industry Standard Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: r Pressure Vacuum Hydrostatic <br /> Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> ST ill,Bax Tank TI Spill,Bo #Tank,T2 <br /> REG UNIL <br /> �"S);JI?REME Ful l'� l , <br /> ;.'DIrcgt�-Grade level <br /> Direct-Grade leuol <br /> Bucket Diameter: 12.00 12.00 <br /> Bucket Depth: 13.00 13.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min min <br /> starting test <br /> Test Start Time. 09:28:00 09:34:00 <br /> Initial Reading(RI): 30.00 in.H2O 30.00 in.H2O <br /> Test End Time: 09:29:00 09:35:00 <br /> Final Reading(RF): 28.00 in.H2O 29.00 in.H2O <br /> Test Duration: 1 min 1 min <br /> Change in Reading(RF-RI): -2.00 in.H2O -1.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/-4.00 +/_ +/- <br /> Test Result: Pass T'ass. <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2314890 <br />