My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 1:18:05 PM
Creation date
6/3/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2012-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oAq�IN• c <br /> SAN JOAQUIN COUNTY <br /> WNVIRONMENTAL HEALTH DEPARTMENO <br /> �IYE 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209)468-3433 Web:www.sigov.org/ehd <br /> �q�I FOR�`P <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> Facility Address: Service Request#: <br /> Onsite Service Technician's Name: IC ervice Technician/Installer Exp.Date: Manufacturer Training: <br /> SERVICE SERVICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ mechanical Model >2 ��� ❑ ❑ 1 hour hydrostatic ElIncon TS-STS <br /> )P-electronic Serial#: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ ❑ mechanical Model: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: ❑ Caldwell System ❑ Other <br /> ❑ line test programmed <br /> sensor <br /> El positive shutdown Model: ElPrimarysiping testing at: <br /> ❑ fail safe Serial#: p <br /> ❑ NA minutes <br /> sensor Secondary containment testing for: <br /> ❑ positive shutdown Model: UDC <br /> Els( ) Piping <br /> ❑ fail safe Serial#: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial#: Note: Please be aware that 2°containment components are required to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% Nil Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) ❑ Other: see below <br /> This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> Gr <br /> THA FACILITY IS SUBJECT TO REINSPECTION T NY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Ins ctor Rece' ed By: Title: <br /> EHD 23-0 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 4/30/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.