Laserfiche WebLink
Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps <br /> Fill Riser Containment Sumps are Present, but were Not Tested <br /> Test Method Developed By: r Spill Bucket Manufacturerr* Industry Standard r Professional Engineer <br /> f" Other (Specify): <br /> Test Method Used By: r Pressure C` Vacuum i~' Hydrostatic <br /> Other (Specify): <br /> Test Equipment Used: LAKE TESTA Equipment Resolution: 0.0625 in. <br /> Spill Box-# Spill Box,# <br /> Tank T1-4UPREME Tank T2 REG UNLEAD Spill Bo)(,# Spill Box # <br /> Fill- Direct Fill -Direct <br /> Bucket Diameter: 15.00 15.00 <br /> Bucket Depth: 13.00 13.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min 10 min min m i n <br /> starting test <br /> Test Start Time: 10:01:00 10:01:00 <br /> Initial Reading(R,): 12.50 in. 12.50 in. <br /> Test End Time: 11:01:00 11:01:00 <br /> Final Reading ut,): 12.50 in. 12.50 in. <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(x,4,): 0.00 in. 0.00 in. <br /> Pass/Fail Threshold or Criteria: +/- 0.00 +/- 0.00 <br /> Test""It..' IL <br /> Pass Pais <br /> Comments? (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ( all fill spill buckets pass. <br /> i <br /> f <br /> i <br /> i <br /> i <br /> i <br /> i <br /> I <br /> 1 <br /> W0: 2301480 <br /> i <br />