Laserfiche WebLink
r' <br />.o ®f TRU rEta SAN JOAQUIN LOCAL HEALTH DISTRICT <br />a Cut ®on. Pro @. <br />t® E. vannucct. Sac'V. <br />-natte van sp,on,an 1601 East Hazelton Avenue, P. 0. sox 200-9 <br />uGb** <br />t <br />au®tka Stockton. Callfornla 95201 <br />L. Floras 209/466-6781 <br />I. Most. M.D. <br />J. Wada foal Khanna. M.o.. M.P.H.. ofsttict Haafth offkN <br />.nna low <br />acility Name (, <br />Jdress <br />fate of Inspection j 2� <br />_ Inspector <br />-)NITORTNG ALTERNA.TIVC dT <br />SEftvftt® <br />e city of Lodf <br />San Joaquin county <br />City of Escafon <br />city of Maniacs <br />City of Ripon <br />City of Stockton <br />My of Tracy <br />Sae Joaquin County <br />San Joaquin County <br />-mited to`undernround storage tanks which have inf <br />requent inputs and withdrawals and <br />,ere the Iigtrit: level in the tank can be measured to an accuracy of +5 gallons or less <br />ien the tank is half full <br />_is monitoring alternative shall include: <br />'Annual precision test on tank andi in <br />P P 4 <br />Tank gauging performed as follows: <br />LZ Tank must be capable of being e'ng secured to prevent unauthorized inputs and <br />• withdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />✓ Liquid level measurements are taken at the beginning and end of the t <br />monitoring period (lasting at least 48 hours) <br />(Forezample:levelmeasured and recorded Friday night before i <br />locking and again`on Monday morning before opening.) <br />a <br />�If liquid level varies more than 1% of the tank volume or 5 gallons,which <br />ever is less, between measurements, an unauthorized.release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours as <br />per Article S, Sect. 2652 of the regulations and further j <br />evaluations shall be performed to verify or disprove the variations. <br />lementation of the monitoring alternative requires that the following circled items be <br />pleted by the dates specified. <br />Precision test(s) must be performed by and r <br />office within 30 days of the test.` exults submitted to this <br />Tank gauging must be started immediately. (See instructions above). <br />the above compliance dates cannot be met, contact this office prior to the specified <br />UGT 3 <br />T) <br />