My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2023 11:28:43 AM
Creation date
6/3/2020 9:53:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK INSPECTION RECORD 16 <br />NEW TANK INSTALLATION <br />SITE NAME INSPECTOR'S NAME ClVrIeS 11UA,74 <br />`.-ADDRESS I / CITY Z .11, zip q5A to <br />CONTRACTOR: NAME % .r (bl� PHONE 16 A 96 7 7</.Zfj <br />OWNER: NAME q -r-, c ell PHONE kP,�, A4, r>& ®Z -95+., - f <br />ITEM OR EQUIPMENT INSPECTED <br />. Fees paid <br />F. Plans Approved <br />g <br />lei, <br />V <br />I I <br />C <br />eff <br />%w C. INITIAL INSPECTION <br />. UL numbers 2.11177 tank size <br />. Tank tested upon delivery (Holiday (plasteet) or air at 5 PSI (FRP)l <br />3. visual inspection of secondary containment. <br />. Tank appropriately placed with approved backfill. <br />Comments: <br />EN 23 006 <br />PIPING STAGE INSPECTION / L �r°c� 7777 <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />2. <br />Balt float valves installed. <br />3. <br />Overfill protection instalted, describe: <br />4. <br />Unused tank opening sealed and cathodicalty protected. <br />5. <br />Visual inspection of secondary containment on piping. <br />' <br />6. <br />7. <br />Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />Fitt and vent piping brought to grade. <br />a. <br />Product line leak detector in place. (Hard wired)���#� <br />9. <br />Approved tank leak monitoring device instalted. <br />0. <br />ALL galvanized piping and fittings properly wrapped. <br />— <br />. <br />Pressure decay test on complete tank and product delivery system. <br />Comments: <br />EN 23 006 <br />INAL INSPECTION <br />1. AzIFision test successfully completed and hard copies received. (NFPA 329) <br />2. <br />Spill protection at fill pipe. <br />3. <br />Performance test of overfill protection system. <br />4. <br />Performance test of product line leak detector. (Hard wired) <br />S. <br />Performance test of continuous monitoring system(s) on tank (s) <br />6. <br />Permit to operate application complete. <br />7. <br />Acceptable recordkeeping system. <br />Comments: <br />EN 23 006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.