My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2023 11:28:43 AM
Creation date
6/3/2020 9:53:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br />OPTION IA <br />ARTICLE 3, SECTION 2631 <br />MOTOR VEHICLE OR NONMOTOR VEHICLE FUEL TANK <br />CONSTRUCTION STANDARDS <br />O(1 _l. Secondard containment provided. 04 <br />OK, 2. Primary containers shall be product tight. -at e,sz;�o <br />of -3. Secondary containers sep 000— <br />A. Thickness, density, composition, and product compatibility. <br />B. Sized to contain unauthorized releases for sufficient time to allow <br />detection and removal. <br />Secondary container volumetric requirements Sv 4t -1A" - <br />A, Single primary container = 100%. <br />B. Multiple primary containers = 150% of largest primary container or <br />10% above aggregate. <br />1. Document interproduct compatibility <br />_5. Secondary containers open to rainfall. <br />A. Volumetric requirement = 24 hours of 25 year storm in addition to <br />primary container volumes. <br />_& IAL 6. Pore space of granular material used as backfill for the primary containers. <br />A. Refer to Section 2631(g). <br />(( 7. Secondard container equipped with,collection system. <br />A. Designed to: <br />1. Accumulate <br />2. Temporarily store <br />3. Permit removal of: <br />a. *Precipitation <br />b. Subsurface infiltration <br />c. Released hazardous substances from primary container(s). <br />C� 8 Floor of Secondary container See Stie-qf-- /14-,f <br />A. Constructed on firm base <br />B. Sloped to collection sump (1/8" per foot). <br />1. One or more access casings installed in sump <br />a. Sized to allow removal of collected liquid <br />b. Extend to ground surface <br />c. Perforated in sump region. <br />d. Covered with a locked waterproof cap or within a secured facility <br />e. Thick enough to withstand anticipated stresses <br />f. Construction materials: - <br />1) Are not weakened by stored product <br />2) Will not donate, capture, or mask constituents to be analyzed. <br />�9- Membrane liner specifications: <br />A. Refer and comply with Article 3, Section 2631 j, k, 1, and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.