Laserfiche WebLink
I AM <br /> 4. ILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: VISUAL/MEASURE Equipment Resolution: N/A <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: Ill, <br /> Bucket Depth: 11 3/4" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES <br /> starting test: <br /> Test Start Time: 8:30 <br /> Initial Reading(Rj): <br /> 71/4" <br /> Test End Time: 9:30 <br /> Final Reading(RF): <br /> 71/4" <br /> Test Duration: 1 HOUR <br /> Change in Reading(RF-Rj): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pas=EIFail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />