Laserfiche WebLink
0 <br /> SECONDARY PIPE TESTING <br /> „Tesl Method Developed By: ®Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Uses: ®Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Measuring Equipment Used for Testing: DWYER MANOMETER <br /> Piping Run# Piping Run# Piping Run# <br /> Piping Material: POLY/RUBBER <br /> Piping Manufacturer: WESTERN FIBERGLASS <br /> Piping Diameter: 4" <br /> Length of Piping Run: 100'APPROX <br /> Product Stored: DIESEL <br /> Method and location of SUMP TERMINATION <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MINUTES <br /> starting test: <br /> Test Start Time: 10:35 <br /> Initial Reading(Rj): 5.927 PSI <br /> Test End Time: 11:35 <br /> Final Reading(RF): 5.226 PSI <br /> Test Duration: 1 HOUR <br /> Change in Reading(RF-Rj): -.701 PSI <br /> Pass/Fail Threshold: 1.0 PSI <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> permit was obtained for the repairs) <br /> Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br /> which is generally consistent with testing performed at time of installation. <br /> R.C.U.S.T.COM <br />