My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:59:43 PM
Creation date
6/3/2020 9:53:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> SECONDARY PIPE TESTING <br /> „Tesl Method Developed By: ®Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Uses: ®Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Spec) <br /> Measuring Equipment Used for Testing: DWYER MANOMETER <br /> Piping Run# Piping Run# Piping Run# <br /> Piping Material: POLY/RUBBER <br /> Piping Manufacturer: WESTERN FIBERGLASS <br /> Piping Diameter: 4" <br /> Length of Piping Run: 100'APPROX <br /> Product Stored: DIESEL <br /> Method and location of SUMP TERMINATION <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MINUTES <br /> starting test: <br /> Test Start Time: 10:35 <br /> Initial Reading(Rj): 5.927 PSI <br /> Test End Time: 11:35 <br /> Final Reading(RF): 5.226 PSI <br /> Test Duration: 1 HOUR <br /> Change in Reading(RF-Rj): -.701 PSI <br /> Pass/Fail Threshold: 1.0 PSI <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> permit was obtained for the repairs) <br /> Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br /> which is generally consistent with testing performed at time of installation. <br /> R.C.U.S.T.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.