Laserfiche WebLink
SWRCB,January 2002 Page 2 of 2 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed by ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used ®pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Dial Guage 4" Equipment Resolution:.I <br /> Piping Run#Vent Piping Run# Piping Run# Piping Run# <br /> #UE020U001 <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Amcron <br /> Piping Diameter: 3" <br /> Length of Piping Run: —3.5' <br /> Product Stored: Diesel <br /> Method and location of piping-run Test Port @ Vent <br /> isolation: Riser <br /> Wait Time between applying 15 Min. <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 10:00 AM <br /> Initial Reading(Ri): 5 PSI <br /> Test End Time: 11:00 AM <br /> Final Reading(Rf): 5 PSI <br /> Test Duration: I Hr <br /> Change in Reading(Rf-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result ®Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments include any information on repairs made 'or to testing,and recommended follow-up for failed tests <br /> Broke Concrete to replace boot clamps. <br />