My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Product Data <br /> STANDARD SECONDARY CONTAINMENT PIP1 SYSTEMS <br /> Pressure Range(Static)for <br /> Primary Primary Sizes Priay(Product)Piping 'Temperatures Resin Type <br /> Pipe System (In.) (prig) (MPa) (°F) (°C) <br /> Red Thread Ii 2"-16" Up to 450 Up to 3.1 210 99 Epoxy <br /> Green Thread V-16- Up to 450 UP to 3.1 225 107 Epoxy <br /> Z-Core 1 -81, Up to 150 Up to 1.0 275 135 Epoxy <br /> RB-2530 1"-14" Up to 150 Up to 1.0 250 121 Epoxy <br /> CL-2030 1"-14" Up to 150 Up to 1.0 200 93 Vinyl Ester <br /> RB-1520 1M."-14" up to 150 up to 1.0 250 121 Epoxy <br /> CL-1520 1'r4"-14" Up to 150 Up to 1.0 200 3nyi Ester <br /> Minimum Containment Pipe Minimum Containment Pipe <br /> If the Primary Pipe Size Required for RT II/GT Size Required for RB/CL <br /> Size is: Primary Pipe is: Primary Pipe is: <br /> (in.) (In.) (i .) <br /> 1 - 3 <br /> 1 V2 - 3 <br /> 2 3 3 <br /> 3 4 4p <br /> R <br /> 4 6 6� <br /> 6 8 <br /> 8 10 10- <br /> 10 12 12 <br /> 12 14 14 <br /> 14 16 16 <br /> RT tt = RED THREAD If R6=R8 2530&RS-1520 CL=CL-2030 A CL-152€1 <br /> GT = GREEN THREAD ZC=Z-CORE <br /> 'When using 2,3°,or 4" fittings,use containment pipe <br /> and fittings that are two diameter sizes larger ttm the primary_ <br /> Contact the factory for recommendations. <br /> "When using 8'W elbows,12-conta went 90°elbows may <br /> be . Contact factory for reco ations_ <br /> n using 3"90°elbows,6"contaimnent 90'ebow may be <br /> needed.Contact the factory for recd abons_ <br /> pr <br /> (nti# i <br /> + tl <br /> 16 in i elft [9 <br /> 55-To=114 �M'yll Z gale <br /> e . <br /> � "Btft .... t .i4 iiilip a ., <br /> *Trademark of Nares I/P Inc_ FIBER GLASS SYSTEMS•A NATIONAL OILWELL VARCO COMPANY <br /> *2005,NATIONAL OILWELL VARCO 2700 W.65th ST,LITTLE ROCK,AR 72209.501-5 010•FAX 501-568-4465 USA 1.5M0708 25 S.MAIN ST.,SAND SPRINGS,OK 74063.918-245-6651•FAX 918-245-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.