My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ft/19/20l'ti 139:25 831648 4 SPECIAL SERVICE PAGE 04 <br /> Monitoring System CertifiCation <br /> Address: 124 W, ELM ST.LODI 95242 Service Date:07/30/2008 <br /> F. In-Tank Gauging/SIR Equipment ❑Check this box if tank gauging is used only for inventory control <br /> ®Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment iS used to perform leak detection monitoring <br /> Complete the following checklist <br /> oyes ❑No` Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> QYes ❑No` Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> ❑Yes ❑No" Was accuracy of system product level readings tested? <br /> ®Yes ❑No° Was accuracy of system water level readings tested? <br /> []Yes ONo* Were all probes rainstallad properly? <br /> 0Yes ONO* Were all items on the equipment manufacturers maintenance checklist completed? <br /> 1n the Section H below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors(LLD): ❑Check this box if LLDs are not installed <br /> Complete the followIng checklist <br /> []Yes O Noo For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑N/A Simulated Leak Rate(check all that apply) []3.0 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> [ Yes ❑No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> []Yes [:]No* Was the testing apparatus properly calibrated? <br /> [jYes ❑No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No. For electronic LLDs,does the turbine automatically shut off if the LLD detects a teak? <br /> (❑N/A <br /> (QYes ❑No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is <br /> C7 N!A disabled or disconnected? <br /> ❑Yes ❑No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or fails a test? <br /> ❑NIA <br /> ❑Yes ®No" For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> d N/A <br /> DYes []No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H below,des cnbe how and when these deficiencles were or will be corrected <br /> H. Comments <br /> ALL FUNCTIONS ARE NORMAL,THEREFORE NO GROUND FAULTS ARE PRESENT AT THIS TIME. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.