My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0, <br /> RE: Pacific Bell Telephone dba ATT 124 W.Elm St.Lodi CA 95240 S0058584 <br /> 5. Any changes in information and scope of work must be submitted to EHD for <br /> approval prior to commencing work. All new addenda supersede the previous <br /> ones. <br /> 6. Contact Aris Cacapit to arrange the following inspections (a 48 hour notice is <br /> required <br /> a. One hour hydrostatic test(or equivalent)on the diesel spill bucket. <br /> b. Verify minimum 5 gallon capacity. <br /> c. The test fluid should cover the top joint, and be no less than 1.5 inches <br /> below the top of the spill bucket,regardless of the diesel spill bucket's <br /> capacity. <br /> d. Test operation of the drain valve of the diesel spill bucket. <br /> 7. If concrete is broken near the UST, a third party tank integrity test and/or line <br /> integrity test(or equivalent)must be performed, once concrete is poured in <br /> accordance with the manufacturer's guidelines. Results must be received by the <br /> EHD within seven days of returning the facility to operating condition. <br /> 8. An"Underground Storage Tank Certification of Installation/Modification" form <br /> (form C) shall be submitted by the owner or the owners'agent [pursuant to(CCR) <br /> 2635(d)] before this repair will be considered complete by the EHD. <br /> If you have any further questions,please contact me at(209)468-3453, fax to (209)468- <br /> 3433 or email to acacapit@sjcehd.com <br /> Thank you, <br /> Aris Cacapit <br /> Registered Environmental Health Specialist <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.