Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE I <br /> TYPE OF ACTION ❑ I.NEW PLAN ® 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. Mm_. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - _ <br /> BUSINESS NAME(Same as FACILITY NAME) Pacific Bell Telephone Company dba AT&T California UE020/LODICA01 Moa. <br /> BUSINESS SITE ADDRESS 124 W. ELM STREET M04. CITY LODI M05_ <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be perforned by qualified personnel. <br /> MONITORING EQUIPMENT 1S SERVICED ® L ANNUALLY Mas. ❑ 99.OTHER(Specify): Mol. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location ofeach sensor,line leak <br /> detector,monitoring system control panel,etc.). Ifyou already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification form,Hazardous <br /> Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM Mn. <br /> PANEL MANUFACTURER: Veeder Root M12. MODEL#: TLS-350 M13. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14. MODEL#(S):794390420 MI5" <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16' MODEL#: M17. <br /> IN-TANK PROBE MANUFACTURER: MIR' MODEL#(S): M1y. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYINIGHTLY ❑ c.WEEKLY M20. <br /> [3d.MONTHLY [3e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: [3a.O.l g.p.h. [3b.0.2 g.p.h. [3c.OTHER(Specify): M22.M23 <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26.M27 <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Re"irea age yappmao <br /> ❑ 99.OTHER(Specify): M28. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao' <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SYTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.VACUUM M31. <br /> PANEL MANUFACTURER: Veeder Root M32. MODEL#: TLS-350 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root Mia MODEL#(S): 794380-208 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? ❑ a.YES ® b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? I❑ a.YES ® b.NO M37. <br /> ❑ 2. MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF PRODUCT FLOW <br /> WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): Mme' MODEL#(S): May' <br /> ❑ 3. ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40' MODEL#: Mat. <br /> PROGRAMMED IN LINE TESTING: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44' <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45.M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> "Raluna agency approval -All-ed fa monitoring of a.buried emergency gawata fuel piping only per NSC 025291.5(bH3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> M4R. <br /> ❑ <br /> 99.OTHER(Specify) <br /> hwfwrc-d(9/24/04)-2/4 <br />