Laserfiche WebLink
tonitoring System Certification <br /> Address: 124 W. ELM ST.LODI 95242 Service Date:06/18/2008 <br /> UST monitoring Site Plan <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . .� . <br /> V10. . . , . . , . . . . <br /> . . . _ 1 , <br /> . . . <br /> to 1V Idr—1010 <br /> 1. <br /> Date map was drawn:06/18/2008 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, . <br /> with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment <br /> areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). <br /> In the space provided, note the date this Site Plan was inspected. <br /> I <br /> Page 4 of 4 <br />