My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH & SAFETY 2007 <br /> HOSPITAL ADDRESS <br /> Lodi Memorial Hospital <br /> Address: 1235 W Vine St, Lodi, CA 95240 <br /> Phone: (209)339-7600 <br /> HOSPITAL ROUTE <br /> 1, Start at 124'W ELM ST,LODI going toward'N CHURCH ST <br /> 2. Turn Left on N CHURCH ST-go 0.9 mi <br /> 3; Turn Right on W ,EST.-go 0.6 mf <br /> 4. Arrive at 1235 W VINE ST,LODI,on the Right <br /> 8.2 EMERGENCY PROCEDURES <br /> On-site personnel will use the following standard emergency procedures. The SSHO shall be <br /> notified of any on-site emergencies and be responsible for ensuring that the appropriate <br /> procedures are followed. <br /> PERSONNEL INJURY: <br /> Upon notification of an injury, the SSHO will assess the nature of the injury. If the cause of <br /> the injury does not affect the performance of site personnel, operations may continue, with <br /> the appropriate on-site field personnel initiating the appropriate First-Aid and necessary follow- <br /> up. If the injury increases the risk to others, all field personnel shall be moved to a safe <br /> location until further instructions. <br /> Activities on site will stop until the added risk is removed or minimized. <br /> FIRE/EXPLOSION: <br /> In the event of a fire or explosion on site, the Fire Department well be summoned. All site <br /> personnel shall assemble at"rally point" a safe distance from the involved area. <br /> PERSONAL PROTECTIVE EQUIPMENT FAILURE: <br /> If any site worker experiences a failure or alteration of protective equipment that effects the <br /> protection factor, that person shall immediately stop that particular work activity and repair or <br /> replace the failure. Should the failure of the personal protection equipment be unrepairable, <br /> and then that worker will stop that work activity and report the failure to the SSHO. That site <br /> worker will be reassigned to other work activity not requiring that particular PPE and shall not <br /> be permitted to allowed to continue the previous work activity until the equipment has been <br /> repaired or replaced. <br /> THEREQUIPMENT FAILURE: <br /> 11/07/2005 revision 5 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.