My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:02:36 PM
Creation date
6/3/2020 9:53:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2006-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HEALTH & SAFETY 9 0 7 <br /> 9.2.2 PHYSICAL HAZARDS <br /> * Noise <br /> * Heat Stress <br /> * Open Excavation <br /> * Heavy Equipment <br /> * Confined Space <br /> * Slip, trip and fall hazards <br /> * Electrical Hazards <br /> 9.3 HAZARD CONTROL MEASURES <br /> 9.3.1 PERSONAL PROTECTIVE UIP <br /> * Follow instructions in the HASP <br /> 9.3.2 BARRIERS AND SIGNS <br /> Barriers and signs shall be installed around the open excavation. Signs shall state " O <br /> SMOKING." <br /> FIRE and/or EXPLOSION PREVENTION <br /> Due to the presence of flammable materials and substances on the site, <br /> proper housekeeping practices will be followed. These include storing debris <br /> in a designated location for removal,job-site cleanup at the end of each day, <br /> and storage of hazardous materials according to Tait°s existing practices and <br /> procedures. <br /> Tait shall have the appropriate fire extinguisher equipment on the job prior to the start <br /> of the project. No cutting torch, open flame, or spark producing equipment shall be <br /> used on the tank or piping at any time. Any source of ignition shall be at least 50 feet <br /> away from the excavation site. <br /> A properly calibrated flammable/combustible gas and oxygen analyzer is required on <br /> the job site prior to excavation or removal. Calibration of the meter must be within the <br /> last three months. <br /> 11/07/2005 revision 5 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.