Laserfiche WebLink
UE020 • • <br /> BUSINESS NAME(Same as FACILITY NAME or DBA-Doing Business As) 3 <br /> Pacific Bell Telephone Company dba AT&T California UE020 <br /> BUSINESS SITE ADDRESS 103 CITY 104 <br /> 124 W Elm St Lodi <br /> Revised 9/29/2011 <br /> Monitorin''Plan Chane History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 2/2/2009 Section V:Added Monthly Visual Pipe Monitoring;Section X:Added AN Alarms as Primary Overfill Prevention;Section <br /> XI:Replaced ESM with Vendor <br /> 5/14/2009 Section VIII: Added Visual Inspection Records; Section X: Revised Primary Overfill Prevention to Fill Tube Shut-Off <br /> Valve,Added Fire Box Sensor w/Location <br /> 9/29/2011 Sections IV &V: Specified TLS Model#; Specified Sensor Locations; Section X:Added new Belly Tank Annular Sensor <br /> w/Location;Section XI:Offered Vendor Contact List Upon Request <br /> Response Pian Chan a Histo <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 2/2/2009 Removed Shaw from Section III and Added ESM to Section IV <br /> 4/18/2010 Updated to latest Unidocs form <br /> 9/29/2011 Updated to latest Unidocs form;Section IV:Offered Contact List Upon Request <br /> Facility Information Form Change History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 2/2/2009 Section IV:Revised Tank Owner Info to Dallas address;Section VI:Revised Permit Holder Info to Tank Owner <br /> 9/29/2011 Section VI:Revised Permit Holder Info to Facility Owner <br /> Tank Information Form Change History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 5/14/2009 Section II:Updated Tank ID#;Section IV:Added Fill Tube Shut-Off Valve <br /> 6/9/2009 Section III:Changed Fuel Usage to Emergency Generator <br /> 5/11/2010 Section VI:Added Vent Secondary Piping Material Fiberglass;Section VI:Removed Containment Sum <br /> 9/29/2011 Section II: Specified Install Date; Section VI:Added Containment Sum <br /> Site Plan Change,Histo <br /> Revision Date Reason for Revision <br /> 8/10/2007 Stantec Site Plan#1 <br /> 1/4/2008 Stantec Site Plan#2 <br /> 5/14/2009 New Site Plan created <br /> 1/12/2010 Added Generator Room Floor Sensor <br /> 9/29/2011 Added Tank ID#s,Sensor Locations,ATG;Added new Belly Tank Annular Sensor;Relocated Overfill Alarm <br /> UN-022B www.unidocs.org Rev. 12/2010 <br />