My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1985-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:35:11 PM
Creation date
6/3/2020 9:53:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1993
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1985-1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2600 Camino Ramon,1.6. 2E050 <br />San Ramon, CA 94583 <br />July 14, 1988 <br />Ms. Laurie Cotulla <br />Environmental Health <br />San Joaquin Local Health Dept. <br />P.O. Box 2009 <br />Stockton, CA 95201 <br />Dear Ms. Cotulla: <br />PACIFIC64BELL,. <br />A Pacific Telesis Company <br />JULY�ul aly Z4 <br />18 ra; <br />INVIROMENTAL HEALTH <br />PERMIT/SERVICES <br />Enclosed are two (2) sets of Pacific Bell Underground Storage <br />Tank Hazardous Materials Management Plan for our facility <br />located at 345 North San Joaquin Street, Stockton, CA. <br />Subsequent to your review and approval of our proposed <br />monitoring plan, would you please return one copy of the plan <br />(appropriately identified as approved) to me at the above <br />address. <br />During the interval between this filing and the installation of <br />the Monitoring System, it is our intent to continue with our <br />present inventory reconciliation program. This requires weekly <br />dip sticking of our diesel tanks, which service our stand-by <br />generators. <br />If you or your staff require additional information regarding <br />our Environmental Management programs, please contact us. <br />Sincerely, <br />� <br />V <br />M. Della -Rocco <br />Environmental Manager <br />Underground Storage Tanks <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.