My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1985-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:35:11 PM
Creation date
6/3/2020 9:53:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1993
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1985-1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PACIFKZ]BELL- FUEL <br />OIL SPILL PREVENTION <br />LOADINGOPERATIONS FORM <br />DATE TECHNICIAN FUEL SUPPLIER <br />Name company Name <br />buck Ope+ahxs Name <br />PURPOW: To prevent oil spills during storage lank loading operations and to identify and control spills <br />as soon as possible if they occur. <br />001MCTION PE e, throughout and after lank loading operations. <br />*NOTE: Subtract a Safety margin of 1,000 gals per tank before reporting amount to <br />the tank truck operator. check o,, <br />I 1 <br />® Place sheets of synthetic membrane material over all storm drains ............. I.1 <br />Apply a low wall of absorbing material around fill pipe ....................... I 1 <br />5 Verity with tank truck operator that all hoses values and <br />connections have been inspected ...................................... I.—7 <br />FR f2 <br />ick <br />/-,% <br />Place warning devices (salty cones) in front t <br />and behind the tank truck ....................... ..............II <br />OInstruct tank truck operator not to exceed the stated amount in step 1 ........ ( <br />#nft* p«ow•d <br />I I O Enter the quantity of fuel of delivered to each tank: <br />... .. ..... ... .Check ore <br />1 T tan m present during tank filling ........ _ <br />Tank Not No 2 <br />kv hose Visually inspect valves to make sure no fuel oil is flowing before I I <br />is disconnected ................................................ I J I Quantity <br />4 Take precautionary measures to insure fuel oil in hose does not k <br />flow out onto the parking lot ........................................... <br />El ®Verify with tank track operator that the tank truck systems have <br />kV H MWOR spill should occur notify immediate Supervisor and been properly shut off and disconnected before departure ................. I <br />Emergency Control Center on (415) 5424601 ............................. <br />O M spill should occur contact the follow: 11.1% <br />Local fire department ...................................... (._J <br />O State of California Office of Emergency Service (800) 852-7550 ..... I7 <br />© National Response Center (800) 424-8802 ..................... (. J <br />Immediate Supervisor ..................................... l <br />Check at ChM k <br />1 I <br />Insure that storage tanks fill pipes are securely locked ....................... I I O All of containment and absorbent materials are stored away for future use . .. I <br />® File this form with the Spill Prevention Control and Countermeasure <br />Plan al site location and retain for a period of one year ..............:.. ... I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.