My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1993
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_1985-1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 4:35:11 PM
Creation date
6/3/2020 9:53:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1993
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_1985-1993.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING ALTERNATIVE #7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liqui(: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />t Annual precision test on tank and piping. <br />ank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(.2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at thebeginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />i V P'reci'sion tests) must be performed by iL/ and resultssubmittedto this . <br />' office within 30 days of the test. <br />L.. Tank gauging must be started immediately. (See instructions above). <br />the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />tiOARt) OF TRUSTEES <br />SAN JOAQUIN LOCAL HEALTH DISTRICT <br />SERVING <br />Ja ne• Culbertson, Pros. <br />Patricia E. Vannuccl, Secy. <br />City of Lodi <br />Anthonette Van Sproneen <br />1601 East Hazelton Avenue, P. O. Box 2009 <br />Son Joaquin County <br />Earl PlmentelCity <br />StoCkion, California 95201 <br />of Escalon <br />Fern 8upbee <br />City of Manteca <br />Daniel L. Flores <br />209/466-6781 <br />City of Ripon <br />John O. Moat, M.O. <br />City of StocktonCity <br />William J. Wade <br />Jo®1 Khanna. M.O.. M.P.H., District Health Officer <br />of Tracy <br />San Joaquin County <br />Mary Anna love <br />San Joaquin County <br />Facility Name; <br />. <br />Address <br />Date of Inspection <br />r=--- Inspector <br />r <br />MONITORING ALTERNATIVE #7 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the liqui(: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />t Annual precision test on tank and piping. <br />ank gauging performed as follows: <br />Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(.2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at thebeginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />i V P'reci'sion tests) must be performed by iL/ and resultssubmittedto this . <br />' office within 30 days of the test. <br />L.. Tank gauging must be started immediately. (See instructions above). <br />the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 UGT 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.